LYW BIM EXECUTION PLAN (BEP) — 23 Lok Yang Way Project Reference: RFA-BIM-BEP-001, Revision-00, Date: 26.11.2025 Main Contractor: Soil-Build (Pte.) Ltd PROJECT OVERVIEW: - Project: 23 Lok Yang Way, Singapore (Pioneer Planning Area) - Owner: SB (LYW) Investment Pte Ltd - Description: 10-Storey Multi-User General Industry Factory (283 Units) with Industrial Canteen and Covered Linkway - Project Code: LYW BIM GOALS: 1. Better understanding of construction 2. Increase productivity by reducing rework 3. Achieve better quality 4. Enhance quality and efficiency of design information BIM USES: 1. 2D Construction Shop Drawing 2. 3D Coordination and Quality Management 3. BIM 4D Project Planning (Internal) 4. Facility Management (Digital Handover) - Optional SOFTWARE/TOOLS: - Autodesk Revit 2023 (RVT, IFC) - Navisworks Manage 2023 (NWC, NWD, NWF) - Revizto 5 (3D Coordination, Clash) - Solibri Model Checker 25 - AutoCAD 2020+ - Autodesk Construction Cloud (ACC) - CDE - cmBuilder (4D Planning) - Enscape (Rendering - Optional) REVIT FILE NAMING: LYW_DISCIPLINE_AUTHOR_PURPOSE_ZONE/LEVEL_DESCRIPTION Examples: - LYW_ARC_SB_CM_AL (All levels architecture) - LYW_STR_SB_CM_AL (All levels structure) - LYW_MEP_SB_CM_AL_CSM (Combined services) - LYW_MEP_KS_CM_AL_PNS (Plumbing & Sanitary - Koon Seng) - LYW_MEP_FME_CM_AL_FIRE (Fire - Fire Mech) - LYW_MEP_DEL_CM_AL_ELE (Electrical - Deal Engineering) - LYW_MEP_TFSC_CM_AL_ACMV (ACMV - Technical Frigecon) - LYW_MEP_XJ_CM_AL_LFT (Lift - XJ Elevator) DRAWING FILE NAMING: PROJ_ORG_VS_LV_TYP_RL_DIS_COD_NUM Example: LYW_SB_ZZ_XX_DR_W_STR_CPB_0001 KEY CODES: - Project: LYW - Floor Levels: AL=All, UG=Underground, L01-L10, RF=Roof, XX=Not Applicable - Discipline: ARC, STR, MEP - Model Purpose: MM=Master, DM=Design, CM=Construction, AM=As-Built LOD LEVELS: - LOD 100: Conceptual massing - LOD 200: Approximate geometry (Authority submission) - LOD 300: Precise geometry (Construction coordination) - LOD 350: Coordinated (Shop drawings) - LOD 400: Fabrication detail - LOD 500: As-Built (Digital handover) COORDINATION WORKFLOW (6 Steps): 1. 3D Modeling 2. Clash Detection (Navisworks/Revizto) 3. Coordination Meeting (Main Con Internal - ARC, STR, MEP) 4. Technical Meeting (Consultants & Client) 5. Solution - Reply RFI 6. Model Updating MEETINGS: - ICE & Technical Coordination: Weekly, Wednesday 9-11am, SB HQ/Virtual - BIM Coordination: Weekly, Thursday 3-4pm, Site Office/Virtual MODEL SUBMISSION SCHEDULE: - Sub-Con to Main Con: Weekly (Tuesday) via ACC - Main Con to Sub-Con: Weekly (Thursday) via ACC - Main Con to Consultants: 1st Monday of Month via ACC - As-Built: Final submission 07.01.2027 BIM TEAM (MAIN CONTRACTOR - SOIL-BUILD): - Senior IDD Manager: Soe Min Tun (soe.mintun@soilbuild.com, 9109 7619) - BIM Coordinator HQ: Ame Me Kyaw (ame.mekyaw@soilbuild.com, 8621 7504) - BIM Coordinator HQ: Linn Htet Moe Hein (linhtet.moehein@soilbuild.com, 9067 6544) - BIM Coordinator MEP: Moe Hein (moe.hein@soilbuild.com, 9800 5645) - Senior BIM Modeler STR/ARC: Zar Zar Moe (zar.zarmoe@soilbuild.com, 8891 2970) - Senior BIM Modeler Render: Wai Yan Tun (wai.yantun@soilbuild.com, 9133 5516) - BIM Modeler: Koay Yun Zhi (koay.yunzhi@soilbuild.com, 9638 8173) KEY CONTACTS: - Client (SB LYW Investment): Lee Chen Teu (Head of Operations), Leo Huang (PM) - Architect: ID Architects - Abbrielle Loh, Eugene Lim, Jolene Tan - C&S: T C Sin Consultants - Lim Yi Fang - MEP: Bescon Consulting Engineers - Lam Yee Har MODEL QUALITY CHECKS (Weekly): - Visual Check: Revit, Navisworks, Revizto - Clash Check: Navisworks/Revizto/Solibri - Duplicate Check: Navisworks/Revizto/Solibri - Standard Check: Before As-Built, Solibri MODEL EXCLUSIONS (Not modelled in BIM): - ARC: Railing/stair details, door handles, tiling, waterproofing, furniture - STR: Reinforcements, connection details, earthwork - MEP: Internal equipment parts, pipe couplings, wiring, conduits - Elements less than 25mm COLOR CODES (BIM Model): - Submission: Blue=Default, Green=Approved - Construction Status: Magenta=Proposed, Cyan=Existing, Yellow=Deleted - Openings: Red Transparent 50% - Clearance/Maintenance: Orange Transparent 50% DATE FORMAT: YYYY.MM.DD DRAWING REVISION FORMAT: R00, R01, R0X IDD USE CASES IMPLEMENTED: 1. Digital RFI (ACC) 2. ICE Meetings (Revizto & ACC) 3. Visualization & Design Checks (Enscape/Lumion, Solibri) 4. Digital Submission & Approval (ACC) 5. BIM-based Documentation (Revit) 6. Digital Logistics (ACC) 7. Digital Construction Scheduling (Revit & Navisworks/cmBuilder) 8. Digital QA/QC Inspections (ACC & Revizto) 9. Digital Handover (BIM Tools, Revit, Navisworks, Cloud Storage) PROJECT COORDINATE: - SVY21 Datum, Local Easting: 11533.934, Local Northing: 34081.585 - WGS84 Latitude: 1:19:28.17057, Longitude: 103:41:7.30413 - Revit Project Base Point: N/S 34081585.0, E/W 11533934.0, Elev 10200.0